Industrial Park (~1,600 ha) in San Luis Potosí mostly hosting Heavy Industries, with more than 600 ha available for new tenants and available power
Delivery model
hybrid substations and on-site generation
Commercial structure
level
capacity + energy PPA with each tenant
Power Capacity
IPS has two substations connected to the national grid at 230 kV totaling 80 MVA.
In addition: IPS will have a phased 180 MW gas-fired reciprocating engines power plant operational in 2028.
The power plant will grow from its initial 20-40 MW until reaching the expected installed capacity, as required. IPS has an additional substation (40 MVA) currently serving as back-up, which may be used as a main substation when required
.
IPS is developing a 10 MWac Solar PV plant. and a 200 MW gas-fired reciprocating engines power plant to serve a large client with special requirements (AI Data Center). Both plants will be operational at the end of 2028
Location:
San Luis Potosí city
Av. Sierra Leona 360 Piso 11 Col Villantigua CP 78214 San Luis Potosí, San Luis Potosí